Project Details

Each system includes a day tank with mixer, high level alarm, pressure relief valve, calibration column, and the required valves.

The building has a roll up door to allow for bulk, concentrated chemical in totes to be placed on a rack inside the building for dilution in the day tanks.  The piping is 316 SS tubing or welded polyethylene.

The baseplate, tote rack and skid frame are all galvanized against corrosion.  All welding on the structure and piping was performed per ASME IX.  The building has forced air ventilation for cooling, heat for winter freeze protection, and an overhead trolley for equipment removal.